Projek Bina / Pasang Loji / Kolam Takungan Dan Paip Utama Daerah Manjung (Fasa II) | Kontrak No.1 - Supply And Lay Submarine 600mm Steel Pipeline From Teluk Batik To Pangkor Island (3km)
Completion Date: October 2009
Client/Main Contractor: Lembaga Air Perak / Intraline Resources / Wibawa Works

Scope of Work:
  • Dredging for pipe trench in 14m to 18m depth and volume of about 120,000m³.
  • Pre-fabrication 10m long reinforced-concrete cladded (130mm thick) steel pipe 645mm dia (shell 8.8mm thick).
  • Construction of pipe launchway.
  • Construction of 400 tonne winch structure.
  • Pipe pigging and hydrostatic test.
Reclamation works for launching platform
Reclamation works for launching platform
Laying amour rock for slope protection at platform
Laying amour rock for slope protection at platform
Laying amour rock for slope protection at platform
Laying amour rock for slope protection at platform
Launchway under construction
Launchway under construction
Dredging for subsea pipe trench
Dredging for subsea pipe trench
Laying winch cable
Laying winch cable
Preparing pullhead for pipe launching
Preparing pullhead for pipe launching
Winch in action
Winch in action
Pipe being pulled to Pangkor Island shore
Pipe being pulled to Pangkor Island shore