Projek Menaiktaraf Sistem Saliran Sungai Rasau Fasa II - Kolam Takungan Banjir Di Atas Lot 336 Dan Kerja - Kerja Berkaitan (Pakej A)
Completion Date: February 2010
Client/Main Contractor: Jabatan Pengairan Dan Saliran Malaysia / Aliran Musim Sdn. Bhd.

Scope of Work:
  • Construct Outlet Structure.
  • Earthwork.
  • Installing Gabion Wall, Walkway And Handrail Along The Pond.
  • Turfing and Hydroseeding.
Excavation for the slope along the pond
Excavation for the slope along the pond
Piling Works for Outlet Structure
Piling Works for Outlet Structure
Installing reinforcement for Outlet Structure
Installing reinforcement for Outlet Structure
Preparing the base for the outlet channel
Preparing the base for the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Renomattres along the outlet channel
Laying Fibromat to prepare for hydroseeding
Laying Fibromat to prepare for hydroseeding
Installing gabion wall
Installing gabion wall