Sarawak Water Supply Grid Program - Stressed Areas | Proposed Twin 160mm OD HDPE Submarine Main Across Muara Paloh For The Proposed Water Supply To Paloh, Mukim Division
Completion Date: 2021
Client/Main Contractor: JBALB / Layun Enterprise Sdn. Bhd. / BWS / N.H. Wong Construction
Scope of Work:
- Engineering reports, ITP, Methodology and shop drawings.
- Trending and backfilling.
- Laybarge method by spontaneous dredging and laying.
- Installation of concrete mattress (Maccaferri).