The Proposed Miri Water Supply Source Development Phase 2, Miri Division
Completion Date: 2021
Client/Main Contractor: JBALB / BWS / Sinohydro / Trans-Merge Sdn. Bhd.
Scope of Work:
- Engineering reports, ITP, Methodology and shop drawings.
- Trending and backfilling.
- Launchway and winch structure.
- WPS, WPQT, PWR, WQT.
- Welding joints GTAW & SMAW.
- Launching or installation using float and sink method.
- Pigging.
- Cathodic Protection.