Water Supply Grid Program - Stressed Areas Improvement of Water Supply System To Tanjung Manis Jerijeh, Belawai, Sekumang, Rejang Package 1 - Proposed Pipelines From Baji To Sekumang Including Submarine Pipelines And Associated Works
Completion Date: 2021
Client/Main Contractor: JBALB / Weida Works Sdn. Bhd.
Scope of Work:
- Engineering reports, ITP, Methodology and shop drawings.
- Trending and backfilling.
- Launchway and winch structure.
- WPS, WPQT, PWR, WQT.
- Welding joints GTAW & SMAW.
- Launching or installation using bottom pull method.
- Pressure test and pigging.
- Cathodic Protection.